{"id":13943,"date":"2026-09-28T16:21:58","date_gmt":"2026-09-28T20:21:58","guid":{"rendered":"https:\/\/argcsh.org\/?post_type=product&#038;p=13943"},"modified":"2026-09-28T16:22:18","modified_gmt":"2026-09-28T20:22:18","slug":"1915-excavation-trenching-safety-program-development-services","status":"publish","type":"product","link":"https:\/\/argcsh.org\/es\/product\/1915-excavation-trenching-safety-program-development-services\/","title":{"rendered":"1915 \u2014 Excavation &#038; Trenching Safety Program Development Services"},"content":{"rendered":"<h3><strong>Excavation &amp; Trenching Safety Program Development Services<\/strong><\/h3>\n<p>A.R.G. Construction, Safety &amp; Health provides professional <strong>Excavation &amp; Trenching Safety Program Development Services<\/strong> for employers, contractors, and organizations performing excavation and trenching operations.<\/p>\n<p>Our safety professionals can develop a company-specific written program designed around the client&#8217;s operations, excavation activities, workplace hazards, equipment, responsibilities, and applicable safety requirements.<\/p>\n<h4><strong>Program Development May Include<\/strong><\/h4>\n<ul>\n<li>Excavation &amp; Trenching Safety Policy<\/li>\n<li>Management, Supervisor &amp; Employee Responsibilities<\/li>\n<li>Competent Person Roles &amp; Responsibilities<\/li>\n<li>Pre-Excavation Planning Procedures<\/li>\n<li>Underground Utility &amp; Installation Procedures<\/li>\n<li>Soil Classification Procedures<\/li>\n<li>Protective System Requirements<\/li>\n<li>Sloping &amp; Benching Procedures<\/li>\n<li>Shoring &amp; Shielding Procedures<\/li>\n<li>Trench Box Safety Requirements<\/li>\n<li>Safe Access &amp; Egress Procedures<\/li>\n<li>Spoil Pile &amp; Material Placement Requirements<\/li>\n<li>Mobile Equipment &amp; Falling Load Controls<\/li>\n<li>Water Accumulation Controls<\/li>\n<li>Hazardous Atmosphere Assessment Procedures<\/li>\n<li>Traffic &amp; Public Protection Measures<\/li>\n<li>Excavation Inspection Procedures<\/li>\n<li>Changing Condition &amp; Corrective Action Procedures<\/li>\n<li>Employee Training Requirements<\/li>\n<li>Emergency Procedures<\/li>\n<li>Documentation &amp; Recordkeeping Procedures<\/li>\n<\/ul>\n<h4><strong>Regulatory Reference<\/strong><\/h4>\n<p>Programs may be developed with consideration of applicable requirements of <strong>OSHA 29 CFR 1926 Subpart P \u2013 Excavations<\/strong>, including applicable provisions of 29 CFR 1926.650, 1926.651, 1926.652, and related appendices.<\/p>\n<h4><strong>Customized to Your Operations<\/strong><\/h4>\n<p>The scope of each program is developed according to the client&#8217;s excavation and trenching activities, workplace conditions, equipment, workforce, contractual requirements, and identified hazards. A.R.G. may also review existing company procedures and recommend revisions or additional program elements when included within the agreed scope of services.<\/p>\n<h4><strong>Additional Services Available<\/strong><\/h4>\n<p>A.R.G. may also provide Excavation &amp; Trenching Safety Awareness Training, Competent Person Training, Competent Person Refresher Training, field safety inspections, safety audits, and additional EHS consulting services.<\/p>\n<h4><strong>Request Program Development Services<\/strong><\/h4>\n<p>For consultation, scope development, availability, or pricing, contact our Training &amp; Sales Department at <a href=\"mailto:sales@argcsh.org\">sales@argcsh.org<\/a>.<\/p>\n<h4><strong>Important Notice<\/strong><\/h4>\n<p><em>Programs developed by A.R.G. Construction, Safety &amp; Health are based on the information, operations, hazards, and scope identified for the client at the time of development. The employer remains responsible for implementing and maintaining the program, designating qualified and Competent Persons as applicable, conducting required inspections, selecting appropriate protective systems, providing employee training, evaluating changing workplace conditions, and complying with applicable regulatory, contractual, and site-specific requirements. Development of a written program does not by itself guarantee regulatory compliance.<\/em><\/p>","protected":false},"excerpt":{"rendered":"<p><strong>Excavation &amp; Trenching Safety Program Development Services<\/strong><\/p>\n<p>A.R.G. Construction, Safety &amp; Health develops customized written Excavation &amp; Trenching Safety Programs for employers and contractors performing excavation and trenching operations.<\/p>\n<p><strong>Program Elements May Include:<\/strong><\/p>\n<ul>\n<li>Roles &amp; Responsibilities<\/li>\n<li>Competent Person Procedures<\/li>\n<li>Pre-Excavation Planning<\/li>\n<li>Underground Utilities<\/li>\n<li>Soil Classification<\/li>\n<li>Protective Systems<\/li>\n<li>Sloping &amp; Benching<\/li>\n<li>Shoring &amp; Shielding<\/li>\n<li>Access &amp; Egress<\/li>\n<li>Excavation Inspection Procedures<\/li>\n<li>Water &amp; Atmospheric Hazards<\/li>\n<li>Mobile Equipment Safety<\/li>\n<li>Emergency Procedures<\/li>\n<li>Training Requirements<\/li>\n<li>Documentation &amp; Recordkeeping<\/li>\n<\/ul>\n<p><strong>Regulatory Reference:<\/strong> OSHA 29 CFR 1926 Subpart P \u2013 Excavations<\/p>\n<p><strong>Service Type:<\/strong> Written Safety Program Development &amp; EHS Consulting<\/p>\n<p><strong>Provider:<\/strong> A.R.G. Construction, Seguridad y Salud<\/p>\n<p>For consultation, scope development, availability, or pricing, contact our Training &amp; Sales Department at <a href=\"mailto:sales@argcsh.org\">sales@argcsh.org<\/a>.<\/p>","protected":false},"featured_media":13944,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[1749,200,147],"product_tag":[1738,1716,259,175,585,1742,1752,254,1750,257,608,261,260,258,256,1734,1751,1753],"class_list":["post-13943","product","type-product","status-publish","has-post-thumbnail","product_cat-excavation-trenching-safety","product_cat-regulatory-compliance-safety-programs","product_cat-safety-management-consulting-services","product_tag-29-cfr-1926-subpart-p","product_tag-a-r-g-services","product_tag-benching","product_tag-competent-person","product_tag-ehs-consulting","product_tag-excavation-inspection","product_tag-excavation-program-development","product_tag-excavation-safety","product_tag-excavation-safety-program","product_tag-protective-systems","product_tag-regulatory-compliance","product_tag-shielding","product_tag-shoring","product_tag-sloping","product_tag-soil-classification","product_tag-trenching-safety","product_tag-trenching-safety-program","product_tag-written-safety-program","first","instock","taxable","shipping-taxable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/product\/13943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/comments?post=13943"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/media\/13944"}],"wp:attachment":[{"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/media?parent=13943"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/product_brand?post=13943"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/product_cat?post=13943"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/argcsh.org\/es\/wp-json\/wp\/v2\/product_tag?post=13943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}